• Configuration of protection panels for 110 kV transmission lines at “Vartsikhe HPP.”
  • Setup of differential protection for 220 kV transmission line Enguri HPP – Egheti 2.
  • Configuration of 35 kV open distribution equipment and protection and control panels at the “Saburtalo 1i” substation.
  • “Bahvi HPP” Synchrophasor Measurements (PMU)
  • Construction of a new 35/10 kV substation in Krtsanisi