- Configuration of protection panels for 110 kV transmission lines at “Vartsikhe HPP.”
- Setup of differential protection for 220 kV transmission line Enguri HPP – Egheti 2.
- Configuration of 35 kV open distribution equipment and protection and control panels at the “Saburtalo 1i” substation.
- “Bahvi HPP” Synchrophasor Measurements (PMU)
- Construction of a new 35/10 kV substation in Krtsanisi